Westcroft Leisure Centre

  • Client:
    London Borough of Sutton
  • Architect:
    The HOCA Practice
  • Accreditation:
    BREEAM Very Good
  • Value:
    £9m
  • Our Role:

    M&E, Building Physics, Energy Modelling and EPC


Westcroft Leisure Centre was built in the 1970s and underwent a £9m refurbishment to bring the facilities up to current standards. The work included a new 25m main pool and 15m training pool with a moveable floor, a large fitness gym with 140 workstations and a new library.

The brief included a requirement to dramatically reduce energy running costs with the latest energy-saving technologies including external over-cladding of the walls to improve the thermal performance. To reduce CO2 emissions, the building is ready for connection to the Hackbridge Energy Network, a sustainable district heating system powered by waste landfill gas.