Skip to main content

Devizes Integrated Care Centre

Photography 360image Photography

Devizes Integrated Care Centre

  • Client:
    Wiltshire Clinical Commissioning Group and Kier Construction
  • Architect:
    DKA Architects
  • Value:
    £8m
  • Accreditation:
    BREEAM Excellent
  • Our Role:

    M&E, BIM Level 2, Building Physics, BREEAM


This integrated care centre for Wiltshire Clinical Commissioning Group is being procured through the NHS P22 framework with Kier Construction. The centre includes consulting rooms, specialist treatment rooms, a dentist’s surgery and a podiatry suite.

The client set a challenging brief for a Zero Carbon BREEAM Excellent building which will be an exemplar for similar NHS developments nationwide.

The building is all-electric with no gas on site and is heated with high-eficiency heat pumps to provide low carbon heating. A large roof-mounted PV array offsets the carbon emissions to achieve the Zero Carbon target.

For a 360 view of inside the building please click here 

Photography 360image Photography